Skip to main content
Question

Maintain Pigment Connector connections in a Google Sheets saved copy

  • October 14, 2025
  • 0 replies
  • 10 views

Forum|alt.badge.img

We are experiencing that if we save a copy of a Google Sheet with Pigment Connector connections, we lose the connections in the copied sheet.  We just want to double-check if there's a way to maintain connections in a copied sheet or is it perhaps on the radar to be supported in the future?  Thank you!

0 replies

Be the first to reply!