Hi
I have a target metric containing a subset. This dimension is a subset of a list present in a source metric. When I reference the source metric the data does not allocate over the subset list items as I would expect.
Do I need to map the complete list into the subset? Instinctively this seems irrelevant as they are effectively the same list so dimensionality is comparable.
This is my source metric -

This is my target metric -

PL3_Overheads is a subset of PL3


